The Seamless Integration Advantage
Unified Performance
Eliminate bottlenecks across Networking, Storage, and Virtualization paths.
Seamless Operation
Guarantee immediate compatibility with **Active Directory, DNS, and DHCP**.
Risk Minimization
Use **Rollback Plans** and **Phased Deployment** to ensure business continuity.
Our 5-Step System Integration & Upgrade Procedure
1
Compatibility Assessment & Planning
The Pre-Flight Check- **Dependency Mapping:** Identify all critical services (**Active Directory, DNS**) that rely on the systems being upgraded.
- **Compatibility Matrix:** Confirm 100% compatibility between all new components (**VMware**, **SAN** firmware) and your existing applications.
- **Migration Strategy:** Detail the cutover plan, including **Phased Deployment** versus **Big-Bang Cutover**.
- **Rollback Plan:** Create a clear, tested procedure to revert immediately to the previous state if needed.
2
Staging, Configuration & Testing
The Lab Environment- **Service Configuration:** Integrate core network services by configuring new **DNS** records and updating **DHCP** scopes.
- **Hypervisor/Storage Optimization:** Fine-tune the connection between **VMware/Hyper-V** hosts and **Storage Holdings** (e.g., **Multipathing** and **LUN masking**).
- **Cross-Platform Validation:** Deploy test **VMs** to simulate real traffic loads and verify data paths between all new and old components.
- **Security Policy Alignment:** Audit final **Firewall** rules to ensure they align with the new **VLANs** and security zones.
3
Execution and Cutover
The Migration Window- **Pre-Cutover Checklist:** Verify all backups are current and obtain final stakeholder sign-off.
- **Integration Execution:** Perform the core system change (e.g., final **vMotion** of production **VMs** to the new cluster, or routing switchover).
- **Post-Cutover Verification:** Immediately run a battery of predefined checks to confirm connectivity and application functionality from end-user devices.
4
System Stabilization and Optimization
The Performance Tweak- **Baseline Monitoring:** Establish a new performance baseline, tracking metrics like latency and CPU utilization across the **VMware/Hyper-V** cluster.
- **Performance Tuning:** Adjust resource **Shares, Reserves, and Limits** on specific **VMs** or fine-tune routing metrics on the **WAN** links based on live data.
- **Security Log Audits:** Perform intensive auditing of the **Firewall** and system logs to confirm seamless operation and security compliance.
- **Documentation Update:** Finalize the "as-built" documentation with all post-cutover configuration changes.
5
Decommissioning and Knowledge Transfer
Final Handover- **Decommissioning:** Safely power down and remove old, unused network and storage assets after data security is confirmed.
- **Knowledge Transfer:** Provide focused training sessions that cover the interactions between the systems (e.g., how **Storage** alerts affect **VM** performance).
- **Post-Implementation Review:** Conduct a final review with the client to confirm all objectives were met and collect feedback.
- **Transition to Support:** Formally transition the new integrated environment to the maintenance team, confirming final **SLA** terms.